Eisai
Hatfield, Hertfordshire
About
Our team began with the strip out and demolition of all the areas back to its core. During the fit-out phase, all essential studwork and timber architraves were installed and the first fix plumbing was carried out to make way for the IPS panel system and the new vanity units. Latex flooring was meticulously used to ensure a smooth and level base for the vinyl flooring placement before the cubicle systems and worktops were delivered and fitted. The second fix plumbing took place before the suspended ceiling tiles were installed and then the main install with sanitaryware finishes and a new DOC M disabled pack. Single core timber entrance doors were hung before final architectural finishes were carried out within the area.